The U702 passes light power BLE 900-902 at Albion. The 907 is about to take the U702 through the scale, while 900-902 await clearance to head for Conneaut for more ore loads. This area is a shadow... (more)
The Bessemer 907 has the sanders going as the 50-car loaded train heads south. The first cut of cars had what appeared to be limestone, followed by taconite pellets.